Task 3: Frame and suspension
Preparation
Assembly time
30 minutes
Tools needed
- T10 torx screwdriver
- wide flat screwdriver (not-provided)
- 3mm hex-head key
- 5mm hex-head key
- 7mm hex-head wrench
- 10mm hex-head wrench
Step 1: Main axis bearing holder
Prepare:
- 8x m4x20 hex-headed screw (longest)
- 8x m4 nut
- 1x main frame (aluminum, painted grey)
- 2x main axis bearing holder with 2 bearings each (aluminum, machined)
- 3mm hex-head key
- 7mm hex-head wrench
Step 2: Differential bar holder
Prepare:
- step 1 assembly
- 1x differential bar holder (stainless steel)
- 3x m4x10 torx screw
- 3x m4 nut
- T10 screwdriver
- 7mm flat wrench
Step 3: Differential bar
Prepare:
- step 2 assembly
- 1x differential bar (aluminum, painted grey)
- 2x plastic plain bearings with flanges (black)
- 1x axis shoulder screw (black)
- 1x 8mm flat washer
- 1x m6 nut
- wide flat screwdriver (not provided)
- 10mm hex wrench
Step 4: Main axis assembly
Prepare:
- 2x differential arm (steel, painted black)
- 2x ball bearing push-rod (plastic)
- 2x m6 screw
- 2x m6 nut
- 5mm hex-head key
- 10mm hex wrench
Step 5: Main axis assembly
Prepare:
- 1x step 3 assembly
- 2x step 4 assemblies
- 2x M6 screw
- 2x M6 nut
- 2x main axis screw (shoulder screw)
- 2x M8 washer
- 5mm hex-head key
- 10mm hex wrench
Step 6: Wheel holders
Prepare:
- 2x type A wheel holder (steel, painted black)
- 2x type B wheel holder (steel, painted black)
- 16x M5x8 hex-head screws (with integrated washers)
- 16x t-nut
- 3mm hex-head key
Step 7: Back frame
Prepare:
- step 6 assembly
- 1x back frame
- 4x M4x8 torx screws
- T10 torx screwdriver